CONSTRUCTION NOTICE

New Notice Additional Notice to Ongoing Project

TO:

Building Coordinators, Buildings & Ground Management Office, Campus Security, Chairpersons, Deans, Directors, Faculty & Staff, Fire Safety, ITS, KOKUA Program, Parking Operations.

SUBJECT:
Bilger Hall Room 101 & 102 Interior Renovation

CONTRACTOR:

Molina Engineering

SCOPE OF WORK:

For Bilger Hall 101: Hazard material remediation based on hazardous materials report. Demolition of built-in cabinets, countertop, furniture and shelving. Demolition of existing flooring and wall base. Demolition of existing doors. Demolition of existing window covering. Demolition of existing signage and installation of new signage. Demolition of existing walls. Demolition of existing acoustical ceiling tiles and light fixtures. Demolition of existing sink and associated plumbing. Install flooring and rubber wall base. Install wood swinging doors and wood sliding barn doors with hardware. Install hardware and paint existing entry door. Install window covering. Install ADA compliant signage. Paint, patch and repair existing walls. Install acoustical ceiling tiles and LED/energy efficient light fixtures. Install IT, data and electrical conduits and outlets to support the modular workstations. Relocate existing fire alarm devices. Modify ductwork and air devices, adjust ceiling diffusers and appurtenances. Install countertop, kitchen casework and sink with associated plumbing and electrical work in compliance with ADA requirements. Coordinate with the University on the installation of modular workstations.  
 
For Bilger Hall 102: Hazard material remediation based on hazardous materials report. Demolition of built-in cabinets, furniture and shelving. Demolition of existing flooring and wall base. Demolition of existing window covering. Demolition of existing signage and installation of new signage. Demolition of existing walls. Demolition of existing doors. Demolition of existing acoustical ceiling tiles and light fixtures. Install flooring and rubber wall base. Install hardware and paint existing entry door. Paint, patch and repair existing walls. Install acoustical ceiling tiles and LED/energy efficient light fixtures. Install IT, data and electrical conduits and outlets to support the modular workstations. Relocating existing fire alarm devices. Modify ductwork and air devices, adjust ceiling diffusers and appurtenances. Coordinate with the University on the installation of modular workstations

EFFECTIVE DATES:

07/29/2024 - 01/06/2025

HOURS OF CONSTRUCTION:

7:00am to 3:30pm

ASBESTOS CONTAINING MATERIAL (ACM) ABATEMENT:

None

ACCESSIBLE ROUTES:

No accessible routes are affected by this work.

ADVISORY:

All persons in the vicinity of this construction are advised to respect all barricades and all posted safety/detour signs. Your patience, cooperation and understanding are requested as the inconveniences inherent to repair work (noise, dust, odors and debris) are generated by this construction.

FACILITIES MANAGEMENT OFFICE (FMO) CONTACT:

Anyone with questions, concerns or comments regarding this Construction Notice may call Jarrett Kubo at 808-956-3749, or e-mail at kuboj@hawaii.edu.