CONSTRUCTION NOTICE
| New Notice | Additional Notice to Ongoing Project |
TO:
Building Coordinators, Buildings & Ground Management Office, Campus Security, Chairpersons, Deans, Directors, Faculty & Staff, Fire Safety, ITS, KOKUA Program, Parking Operations.
SUBJECT:
Art Building: Mechanical Upgrades Project Start Notice
CONTRACTOR:
Economy Plumbing and Air Conditioning
SCOPE OF WORK: The scope of the project shall consist of but is not limited to the following: Removing and replacing various mechanical equipment, systems and related items on the roof. Remove chilled water piping, pipe insulation, valves, supports, and control devices, sheet metal hoods, various control and power wiring. Remove roofing at specific locations facilitating removal of mechanical items and replacing with new roofing. Project shall include the installation of new chilled water piping, pipe insulation, supports, controls, stainless steel hoods, and related electrical. Install roofing patches at all areas disturbed by this work. Also includes hazardous material abatement, commissioning of the HVAC system and DDC modifications. The work shall incorporate provisions to phase the construction progress to manage the limited utility outages allowed and minimize disruptions to the building occupants.
EFFECTIVE DATES:
10/12/2026 - 06/04/2027
HOURS OF CONSTRUCTION:
7:00AM - 5:00PM
ASBESTOS CONTAINING MATERIAL (ACM) ABATEMENT:
None
ACCESSIBLE ROUTES:
No accessible routes are affected by this work.
ADVISORY:
All persons in the vicinity of this construction are advised to respect all barricades and all posted safety/detour signs. Your patience, cooperation and understanding are requested as the inconveniences inherent to repair work (noise, dust, odors and debris) are generated by this construction.
FACILITIES MANAGEMENT OFFICE (FMO) CONTACT:
Anyone with questions, concerns or comments regarding this Construction Notice may call Nicholas Lozanoff at 808-956-4630, or e-mail at nlozanof@hawaii.edu.
Thank you.