CONSTRUCTION NOTICE

New Notice Additional Notice to Ongoing Project

TO:
Building Coordinators, Buildings & Ground Management Office, Campus Security, Chairpersons, Deans, Directors, Faculty & Staff, Fire Safety, ITS, KOKUA Program, Parking Operations

SUBJECT:

Various Buildings, Elevator Modernization Phase 2

Project No. UHM 09-541-750


CONTRACTOR:

Ralph S. Inouye Co., Ltd.  (RSI)

SCOPE OF WORK:

The contractor will be shutting down both elevators to paint the interior of the elevator shaft at the Marine Science Building. The painting will cause excessive odors in the elevator shaft.  The contractor will have fans in the shaft exhausting the fumes out of the vent at the roof level.

DURATION OF PROJECT:

HOURS OF CONSTRUCTION:

ACCESSIBLE ROUTES:

Accessible routes will be affected during construction. If a student or faculty member who needs assistance due to a disability, the elevator will be made accessible. Look for the contractor’s contact numbers which will be posted on the first floor lobby wall. All other able bodied people will be asked to take the stairs.

ADVISORY:

All persons in the vicinity of this construction project are advised to respect all construction barricades and all posted safety/detour signs.  Your patience, cooperation and understanding are requested as the inconveniences inherent to construction (noise, dust, odors and debris) are generated by this project.

FACILITIES MANAGEMENT OFFICE (FMO) CONTACT:

Anyone with questions, concerns or comments regarding this Notice of Construction may call Scott DeMello, Bowers + Kubota Consulting , FMO Project Manager, at 478-7005, or e-mail atsdemello@bowersandkubota.com.

Thank you.